5/12/18 - Chairs are here | Welcome Center is up | Nursery counter installed
4/18/18 - Installing auditorium carpet
3/14/18 - Working on a beam from underneath the old church which was built in the 1800’s. A solid oak beam being transformed into the old rugged cross | Lights and fans installed and modesty rail on stage
2/12/18 - Update
1/16/18 - Making progress in the New Year
12/22/17 - Inside Window Trim looks great
12/15/17 - Lights put in and paint finished | Fellowship Hall being painted | Outside Dryvit is now finished
11/25/17 - Children helping with the concrete for Thanksgiving break | Sheetrock is making more progress upstairs
11/2/17 - Sheetrock going up in Auditorium and insulation is done upstairs | Bro. Tim and Bro. Carter making the Interior Window Casings for the Auditorium
10/7/17 - Brick is finished and looks great!
9/22/17 - Brick is going up
9/18/17 - Brick and Sound going up
9/9/17 - Steeple is up
9/7/17 - Roof is finished
8/28/17 - Roof is going up
8/17/17 - Steeple and Baptistry has arrived
8/8/17 - Finishing up the Stage Framing. Looks great!
8/2/17 - Windows and Overhang installed
7/30/17 - Inside Framing pictures
7/21/17
7/15/17 - Putting up the Final Trusses
7/12/17 - Finished the Outside Framing of Church Walls | Moon is still out at 6:00 AM. Sheeting down the Back Side of Church
7/10/17 - Framing the Auditorium and finish sheeting on roof and synthetic tar paper | Ready for the Metal Roof and Auditorium Trusses
7/3/17 - Finished the Tops of the Trusses
6/26/17 - Auditorium Concrete poured
6/24/17 - More Walls going up in Fellowship Hall
6/21/17 - More Walls being put up
6/16/17 - Aerial View
6/16/17 - Subfloor in with Stairs down to Basement | Gravel unloaded to prepare for a Concrete Floor
6/5/17 - Floor Joists
6/2/17 - The Floor Joists are here
5/31/17 - Updated Framing
5/29/17 - Men's Work Day Framing
5/27/17 - Men's Work Day started Framing before getting rained out
5/24/17 - Pouring the Concrete Floor in the Basement | Basement Floor is Finished
5/23/17 - Overhead View of Progress
5/20/17 - Men's Workday
5/19/17 - Plumbing and Bottom Floor Beams are in | Next step Concrete Floor
5/8/17 - Boom Truck about to pour Concrete Walls | Pouring Concrete
4/25/17 - Digging First Floor Footers | Pouring Footers for Auditorium
4/24/17 - Started putting up Forms for the Walls in the Basement
4/19/17 - Putting in some of the Sewer Lines today
4/18/17 - Most of the Basement Footers finished
4/17/17 - Digging Retaining Wall Footers
4/15/17 - Completed Front Wall of Basement Footers
4/13/17 - Preparing for Footers
4/11/17 - Prepping for Concrete Curbing | Done Digging Out Top Soil
4/10/17 - Carter and General Contractor Tim going over Measurements of the Land
4/7/17 - Machinery is on the Ground and Moving
3/26/17 - Groundbreaking Sunday
Dedication of Building to the Lord by Evangelist Dr. Tom Williams | City of Holts Summit Mayor Landen Oxley and Pastor Nolan Wynn